The basic requirements of geotextile laying:
1. The joint must intersect the slope line; where it is balanced with the slope foot or may have stress, the distance between the horizontal joint must be greater than 1.5m.
2. On the slope surface, anchor one end of the geotextile, and then put down the coiled material on the slope surface to ensure that the geotextile remains in a tight state.
3. All geotextiles must be held down with sand bags. The sand bags will be used during laying and will be reserved for the layer of material on top of laying.