1. Basic level inspection: Check whether the basic level is flat and solid. If there are foreign objects, handle them properly.
2. Trial shop: Determine the size of geotextile according to the site conditions, and try to lay it after cutting. The cut size should be accurate.
3. Check whether the width of the Sarah is appropriate, the overlap should be flat, and the tightness should be moderate.
4. Positioning: Use a hot air gun to bond the overlapping parts of the two geotextiles, and the spacing of the bonding points should be appropriate.
5. When sewing the overlapping parts, the sutures should be straight and the stitches should be even.
6. After stitching, check whether the geotextile is laid flat and whether there are defects.
7. If there is any phenomenon that does not meet the requirements, it should be repaired in time.